Capacitor Kit, 20pcs 450V 22uf Electrolytic Capacitors Assortment Box 105℃ Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier


Affiliate Disclosure: We may earn commissions from purchases made through links in this post



Capacitor Kit, 20pcs 450V 22uf Electrolytic Capacitors Assortment Box 105℃ Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier


  • ♟【High Quality】High quality electrolytic capacitors with stable performance. 100% brand new and high quality
  • ♟【Advantage】This Polarized Capacitors Heat resisting, low leakage, low loss and low impedance.
  • ♟【Application】Suitable for a wide range of electronic applications. Great choice for electronic professionals or enthusiasts.
  • ♟【Specifications】Working Voltage: DC 450V, Surge voltage: DC500V, Value: 22uf, Capacitance Tolerance: ±20%, Operating temperature: 105℃, Dissipation Factor: <0.24 at 20℃/120Hz
  • ♟【Quality Assurance】The quality of our products is guaranteed and can be used without hesitation. If you have any questions during use, please feel free to contact us.


See User Reviews And Ratings On Amazon


More Tube Amplifiers To Choose From

BOYUURANGE Reisong A12 EL34 12AX7 (ECC83) Hi-Fi Audio Stereo Single-end Class - A Tube Amplifier Amp
34 Reviews
BOYUURANGE Reisong A12 EL34 12AX7 (ECC83) Hi-Fi Audio Stereo Single-end Class - A Tube Amplifier Amp
  • Please pay attention before buying, We received feedback from many buyers, reflecting that Reisong A12 Amp have not enough power.Please confirm that your speaker is a bookshelf speakers with a sensitivity 89db or more. We don't think Reisong A12 work well with a floorstanding Speaker or the low sensitivity speakers.
  • Point to Point hand welding, preferred audiophiles, output transformer switch to the 76x40 higher end output transformer.
  • Reisong A12 Amp is an upgraded version of A10, could use more replacement models of tubes without convertor. Come with Tube Cage.
MUZISHARE X7 KT88 x4 Vacuum Tube Integrated Amplifier Push-Pull Power Amp MM Phono Tube Amplifier Balanced XLR 2022 Remote
  • MUZISHARE X7 Upgraded version. Upgraded the internal coupling capacitor, is the designer to debug the custom-made silver film capacitor, relative to the classic version of the extension, control, density is better.
  • MUZISHARE X7 is an integrated Amplifier. This is also a Power Amplifier (there is a group pre-amp input), a Headphone amplifier and this is a amplifier for Phono player too, direct link your phono player to this amplifier to output to speakers.
  • Pure Handmade,point to point hand welding using two high-quality wide-frequency high-quality Japanese EI output transformer using a high-power Z11 core toroidal power transformer dedicated designed for the machine , voltage amplification and promote are used tube 5AR4 for rectifier power supply.
Yaqin MC-84L Stereo Vacuum Tube Push-Pull Integrated Amplifier ,Output Power12Wx2,Tubes 6P14x4pcs 12AX7Bx2pcs
9 Reviews
Yaqin MC-84L Stereo Vacuum Tube Push-Pull Integrated Amplifier ,Output Power12Wx2,Tubes 6P14x4pcs 12AX7Bx2pcs
  • A Serious Tube Amplifier: Even though the price of Yaqin MC-84L is low, but this amplifier virtually is an audiophile grade ultra linear push-pull, full Class A tube amplifier!!!!
  • Premium Grade Construction at a Fair Price:a majority of the components are of audiophile grade, produced by some of the best companies in the industry such as Solen, Siemens and Philips. MKP capacitor for reducing AC to DC voltage,famous Shuguang tubes:12AX7B, superior magnet wires on the transformer core,top-quality output transformer, high-quality volume potentiometer.
  • Impressive Sound: this amplifier produces crystal clear sounds so it will make an excellent addition to your sound system;Push-pull Circuitry:this design means low distortion, high efficiency and high output power.
Willsenton R8 KT88/EL34 x4 Tube Integrated AMP Power Amplifier Headphone (Silver)
  • One amplifier can used wiht tube EL34, KT88 or 6550, so, you can get 3 kinds of sound from different models tubes. The default matching tubes of this machine is KT88. If you need another 2 new sets of tube, please purchase in addition. There is a Red selection button on the Back of the amp to switch.
  • Pure hand-made, the whole machine is welded with scaffolding.
  • Can be used as an Integrated amplifier, power amplifier or Headphone amplifier
Willsenton R-800i 300B 845 Tube Single-Ended Class A Integrated & Power Amplifier Balanced XLR Input
4 Reviews
Willsenton R-800i 300B 845 Tube Single-Ended Class A Integrated & Power Amplifier Balanced XLR Input
  • Hand welding point to point, the main circuit adopts shed welding
  • Two high-end EI type single-ended output transformers with high-end special technology and high-quality broadband response made of Z11 iron core.High-voltage power supply and filament power supply independently use high-efficiency toroidal, high-power power transformers with Z11 cores and special materials.
  • Power-on high-voltage delay and mute delay function (about 30 seconds),Use Japanese ALPS high-end potentiometer

Learn About The Tube Amps And How They Work

Chances are you’ve just bought your first Electric guitar and wish to find out all about guitar amps. Maybe you’re just curious as to how long amps have been around, how they work, or which to purchase. Whatever the reason, by reading this article, you’ll get answers.

History of the Amplifier

Guitar amps have been around for roughly 70 years now, having first appeared during the 1930s. The earliest amps had very poor high treble and bass responses. This was improved over time, as amps became better developed. During the ‘60s, the guitar amp greatly evolved to where it is today when guitarists of that era experimented with deliberately overloading their amp to create Distortion. From that point on, most amps were provided with preamp distortion controls. Playing with distortion has since become an important part of Electric guitar playing

Types of Amplifiers

There are two types of amps: solid state and vacuum tube amps. Additionally, there are some amps that combine both solid state and tube technologies. Most amps, especially the least expensive ones, are solid state because they are lighter and easier to repair than tube amps are. A lot of guitarists, however, prefer the tube amp due to the tube amp’s analog sensitivity, which they claim makes tube amps sound better. While this is probably the case, most beginners can’t afford to shell out the $500-$1000 it costs to buy a good tube amp. That’s why solid state amps are actually a good buy in some cases.

Solid state and vacuum tube amps come in combo (speakers and head) packages or separately. Guitarists who aren’t picky can just buy the combo, while those who are picky can “mix and match” heads and speakers. This is useful for those looking to achieve a certain sound.

How Amps Work/What Watts Mean

Without going into a big, long, technical explanation, amplifiers basically take the vibration (sound) of the string(s) and amplify it, thereby increasing the sound. If you wish to find out more about the technical side of guitar amps, there are several good books that cover the topic pretty thoroughly.

Each amplifier has a certain number of watts. The higher the number of watts, the louder the sound produced by the amp is. Generally speaking, those who wish to play shows will want to get amplifiers with at least 30 watts, preferably at least 50 watts, especially if they plan on playing at larger venues.

Recent Posts